Leeds:
Installed a triplex ac gearless group of lifts serving 20 floors, with mirror finished stainless steel on doors and architraves. Installed a simplex traction lift serving 4 floors, with mirror
finished stainless steel on doors and architraves. Installed a simplex hydraulic lift serving 4 floors, with
patterned stainless steel finishes. Comprehensive maintenance of the 5 lifts on going.

Victoria:
Installed two car lifts serving 3 floors. Four reversed engineered hydraulic lifts, serving 5 floors (this is because a lift contractor did not perform and complete the installation).

contact us

Baker Street:

Modernisation of 2 traction lifts serving 5 floors with mirror finished doors and architraves.
Comprehensive maintenance of the 3 lifts on going.


Lisson Grove:
Installed a tailor made hydraulic lift serving 4 floors, 4 person.
Comprehensive maintenance of the lift on going.

Albert Embankment:
Installed a quad ac gearless group of lifts serving 16 floors and subject to planning raising up to serve 20 floors. With mirror finished stainless steel on doors and architraves.
Installed a triplex traction group of lifts serving 5 floors. With mirror finished stainless steel on doors and architraves.
Installed 2 Duplex traction groups, one serving 16 floors and the other 11 floors. Subject to planning raising up to serve 15 & 20 floors.
Installed a simplex ac gearless lift serving 16 floors and subject to planning raising up to serve 20 floors.
Installed 2 MRL’s serving 5 floors.
Installed one car lift serving 7 floors but used for exhibitions only.
Comprehensive maintenance of the 15 lifts on going.


Finsbury Park:
Installed a tailor made hydraulic lift serving 4 floors , 5 person.
Comprehensive maintenance of the lift on going.

Shoreditch:
Installed a hydraulic lift serving 5 floors.
Comprehensive maintenance of the lift on going.